House & Shop Pads in Tulsa
Pads for new homes, metal shops, barns, garages and slabs. Topsoil stripped, fill placed and packed in lifts, and the top set to grade so the concrete crew has a solid start.
Building Pads, Start to Finish
The pad is the part of a building nobody sees and everybody pays for if it is wrong. Organic topsoil left under a slab rots and settles. Fill dumped in one deep pile settles unevenly. Red clay packed too wet or too dry moves. Cracked slabs and doors that stick are often pad problems.
Redden Excavation builds pads properly. We strip the topsoil, cut the high side and fill the low side, place fill in thin lifts and pack each one, and set the top to the grade and size your builder or slab crew calls for. On a sloped lot that often means a cut on one side and a built-up side on the other.
Metal shops are a big one around Tulsa. A shop pad is usually bigger than the building so there is room for the forms and an apron, and it needs to sit high enough that water runs away from it.

What Goes Into a Pad
- Clearing and topsoil stripping
- Cut and fill to bring the site to grade
- Fill placed in lifts and packed
- Pad sized beyond the building for forms and aprons
- Top set to grade, with fall away from the pad
- Rock or select fill brought in when needed
Metal shops and barns
Pads for metal buildings and pole barns are the most common pad job on acreage around Tulsa.
House pads
For new homes we work to the builder's plan, often alongside the footings and utility trenches.
Sloped lots
Hillside lots need a cut and fill, and sometimes a retaining wall or a swale behind the pad to keep water off it.
Red clay
Oklahoma red clay can shrink and swell with moisture. A pad built at the right moisture and packed well handles it better. On some sites an engineer may call for select fill.
What comes next
Once the pad is set, the concrete crew forms and pours. We can come back for the drive and final grade. See gravel driveways.



How much bigger than the building should the pad be?
Usually a few feet on every side for forms and drainage. Your slab crew will say.
Do I need fill brought in?
On flat low lots, often. On sloped lots, the cut side can sometimes fill the low side.
Can you build a pad in winter?
If the ground is not frozen or saturated.
Do you pour the slab?
No. We build the pad.
How a Job Runs
Call or Send the Job
Tell us where it is and what needs digging. A photo of the spot helps. Emergency? Call, day or night.
811 and a Look
Public lines get marked through Okie811 first. We check the ground, the access for the machines and any private lines.
A Straight Price
You get an estimate and a plain answer on how we would do it. Estimates on planned work are free.
We Dig
The right machine for the spot: the mini excavator in tight yards, the big excavator for deep or long digs.
Backfilled and Clean
Backfilled, packed and graded back. We leave the yard ready to mow, not a mud pit.
Building Pads Near You
Based in the Tulsa area. Pick your town, or call and ask if we cover it.
More services
Dirt Work & Grading
Grading, leveling, cut and fill and site prep for homes, shops and commercial lots.
DetailsSkid Steer Service
Skid steer and track loader work: gravel, leveling, moving dirt and cleanup.
DetailsFill Dirt & Hauling
Fill dirt and gravel brought in and spread, spoil and debris hauled off.
DetailsNeed Building Pads?
Call Kasen or send a few details. Estimates on planned work are free, and emergencies get answered 24/7.